Liandon: Smart Grid

After completion of the More Microgrids project, distribution network operator Liander decided to keep the systems in park Bronsbergen operational for further research. This created the requirement to remotely monitor and control the systems from their national control centre in Arnhem.

In the project Smart Grid Bronsbergen the remote control equipment and protocols have been implemented. At the same time a new version of the local control system was installed. EMforce developed the new control and communication software. In a joint effort with engineers from Liandon, the system was subsequently tested. In May 2012 a full acceptance test was succesfully concluded.

Comments are closed.